Last updated: 2026-05-24 04:00 ICT

Source: Robert KB + Git

Version: v1.1

Release: v3.1.0

Workstreams

Actionable operating status for the AIOS work system: owner, next action, gate decision, risk, and proof level.

This page is manually curated and public-safe. It is not live telemetry or a production control plane.

WorkstreamStatusOwner / roleNext actionGate decisionBlocker / riskProof / evidence

optimize-worker

Execution support layer for routing experiments, benchmark traces, and structured workflow automation.

ActiveLyn + CodexKeep benchmark trace automation parked until a thin slice is chosen.Proceed only when scope is narrow and validation is explicit.Automation can create false confidence if trace quality is unclear.DocumentedBenchmark trace workflow and regression gate

Fallback routing

Policy lane for choosing a safe alternate route when the primary worker or model is blocked.

Policy activeLynRoute work by task type, failure mode, risk, and available worker/model.Use fallback route when primary surface is blocked or uneconomical.Cost and token evidence remain incomplete in some surfaces.Smoke-provenFallback routing policy + smoke test

Profile positioning

Public portfolio framing that turns operating evidence into clear, safe claims.

ActiveLyn + CodexKeep homepage focused on differentiation; avoid internal dashboard drift.Public copy must remain portfolio-safe and evidence-backed.Overclaiming maturity or exposing raw private context would weaken trust.Regression-gatedv3.0 IA regression checks

Supernova

Opportunity and monetization intelligence lane with a first version complete, before POC validation.

First version doneLynDefine the first POC trigger and evidence requirement before treating it as operational.Do not claim POC or operating usefulness until a concrete run is reviewed.A completed first version can be mistaken for validated business evidence.DocumentedFirst version exists; POC not yet run

Big Crew

Scoped execution crew for implementation, architecture review, QA, and release readiness.

StartedLyn + CodexKeep Big Crew usage bounded to implementation and verification tasks with explicit handoff.Use for scoped execution only; do not expand into autonomous staffing.Parallel work can blur ownership if files, roles, and review gates are not explicit.DocumentedPatch 1 and Patch 2 implementation handoffs

Researcher

Bounded evidence scanner for market context, claim safety, and external practice checks.

StartedLyn + ResearcherUse for bounded positioning and claim-safety briefs before public copy changes.Research output informs copy; Robert/Lyn still gate claims before implementation.Broad research can drift into market sizing or unsupported uniqueness claims.DocumentedHomepage differentiation brief

Investment Team

Planned specialist lane for investment workflows after scope and review criteria are defined.

PlannedLynDefer until Supernova produces a first useful signal.No active build until there is a bounded investment workflow.Domain risk is high without review criteria and evidence capture.PlannedPlanning notes only

Reading Rules

Status is not completion

A workstream can be active while still requiring a gate decision before its output counts.

Proof level matters

Documented, smoke-proven, and regression-gated mean different things; the page labels them separately.

No private raw context

The table shows public-safe operating status, not raw KB material, keys, logs, or private traces.